Work on real sites
These silicone coating case studies come from real sites, where the coating had to go on under working conditions. Each one covers the problem, the site, the method and the result.
Plants, tanks and mines

Fertiliser plant Fertiliser plant, Hoopstad Coated in January 2025 while the plant kept running, and still in good condition today.

Chemical plant Chlorine plant, Johannesburg One coat with no primer or hot work, and still clean a year later.

Harbour Hopper in Durban harbour Replaced cracked epoxy in 2024, and still in good condition today.

Concrete Concrete mixer trucks, Métier Twelve weeks later, no concrete had stuck to the coated hopper end.

Oil tank Crude oil storage tank, Hellenic Petroleum 6,000 m² recoated without blasting, so a crew of six finished in 12 days.

Fuel tank Fuel oil tank, Florida Power & Light An 85 m tank in one coat over prepared rust, at about half the cost of a conventional system.

Power plant Process piping, Florida power plant 24 km of pipe in one coat, and 20 years later the thickness had not changed.

Sea water intake Intake screens, Florida power plants Epoxy failed in three years, so new screens went out with one coat of 579 CM.

Acid plant Sulphuric acid tanks, CODELCO Acid transport tanks coated from 2016 to 2018, in the Antofagasta desert.

Copper mine Copper mine, BHP Escondida Worn OEM epoxy replaced in 2016, about 3,100 m up in the Atacama Desert.

Desert Steel structures, Dakhla Five years of Sahara sand and sea salt, with no breakdown.
Silicone coating case studies on power networks

Power lines Transmission towers, Reliant Energy Tower legs in a tidal swamp, brushed on in one coat, with jobs cut from four months to six weeks.

Power lines Pylons and concrete posts, Morocco’s national grid One coat with no blasting, in service since about 2017.

Substation Field trial, Dungeness 400 kV substation Rusted roller door and sea facing gutter coated in 2020, with no blasting.

High voltage Air core reactors, 500 kV substation Cracked reactors, first repaired and then recoated with Si-COAT 570 HS.

High voltage Transformers, Algorta Norte iodine mine Four years with no flashovers, and insulator cleaning cut from monthly to once in four years.

Distribution Pole transformers, Saesa, southern Chile Tanks used to rust in six months. Once coated, none failed in three to four years.
Roads and buildings
How we write our silicone coating case studies
We only publish jobs we can stand behind. For that reason, each case study states when the coating went on and when someone last checked it. Where a job is ours, we also say how it looks today.
Some case studies come from CSL Silicones projects overseas, such as the Florida piping and the transformers in Chile. Others come from signed letters by the contractors who did the work, such as the jobs in Morocco. In those, we quote the figures as published, and we don’t stretch them. Meanwhile, our own Southern African jobs keep growing, so check back often.
For the tests behind these products, see the IEC TR 62730 results, the Florida Fence Test and the C5 coating system page.
Send us the problem
Photos and a rough size are enough to start, while drawings and specs can follow later. Then we come back with the right product and a quote.